Building services specialist Brymec was the first port of call as contractors working for Bournemouth University needed a high degree of specialist input at their £31 million student accommodation project.

Bournemouth University is increasing its student intake and range of facilities but was on a very strict timetable with a new intake of students due to arrive for the Autumn semester. The modern student accommodation, located at the heart of the university’s Lansdowne Campus, will home 550 students in ensuite bedroom apartments and studio flats, all served by full modern kitchen and communal areas.

Brymec was appointed by mechanical and electrical engineers, William Coates, to supply product and technical expertise on the construction of the landmark Bailey Point development. The unusual shape of the development site, within a constrained location, had to be negotiated through the shrewd selection of products and systems that could adapt to the requirements of the project.

The copper press and valve systems were supplied by Brymec, along with technical guidance, to equip the plant room of the block which serves all 550 bedrooms and communal areas.

The time saving copper press system of pipe fittings was selected to provide the on-site contractors with the ability to perform multiple aspects of the plant room install at the same time. In addition, cast iron valves were used throughout the system, while WRAS approved, full bore lever ball valves were fitted to help the building facilities management team maintain and control the finished water supply system.

Throughout the duration of the project the onsite team at William Coates was able to liaise with Brymec’s dedicated project manager to ensure the on-time delivery of components and products to Bailey Point as the development took shape.

Lyndon Fielder, Account Manager at Brymec, comments: “Bailey Point is Bournemouth University’s flagship student development, with its modern design, layout and facilities providing the new residents with the most communal space available on campus, including a roof terrace and free gym. We have worked with William Coates on several projects and we were confident our close working relationship would allow us to deliver best suited products and technical expertise to provide the most advantageous project solution within the tight timescales.”

Dominic McGuigan, Site Engineer for William Coates, adds: “Working with a partner that is easy to contact, easy to deal with and responsive is so important to the success of project like this. Throughout the build of the plant room we were impressed by the quality of the products and materials supplied by the Brymec team. The delivery plan put in place worked very well, ensuring my team could continue to meet its deadlines throughout the project.”